|

POAMA/ACCESS Development plans - POAMA-2system
Purpose/objectives:
- Improve forecasting of El Nino
- Provide comprehensive ensemble set of hind-casts
- Rainfall products
- Intra-seasonal products
Timescale
- Operational trials end 2007, large hind-cast set 2007/8
Ocean model
- ACOM2 (some retuning to reduce noise in the East Pacific)
Ocean data assimilation
- PEODAS (POAMA Ensemble Ocean Data Assimilation System)- new ACCESS data assimilation system, ensemble multi-variate ocean data assimilation system based on an extension of the BODAS systems that uses a time evolving ensemble for the covariance calculation
- Temperature and salinity in-situ data
Atmosphere model
- Use new version BAM3
- Increase resolution T95L17 (subject to satisfactory performance)
Atmospheric/land initialisation
- New atmosphere/land surface nudging scheme
Coupler
Land surface
Hind-casts
- 5-10 member ensemble per month over the period 1981-2007
Real-time forecast system
- As POAMA-1, option to increase ensemble size to around 50.
- Intra-seasonal forecast system (may be separate from seasonal)
Products/output
- Provide range of products for downscaling and user appliations,
contribution to international projects COPES and to the APCC. Need
to ensure output is consistent with international standards - e.g.
COORDS compliant. Work on downscaling/bridging as part of SEACI.
- Suite of intra-seasonal (weekly out to 6 weeks) forecasts
|